亚洲国产精品热久久|久久精品一区二区乱码|亚洲a网91啦丨国产丨|亚洲日韩精品久久久久一区|日本一道人妻无码一区av|亚洲av无码专区一区二区|久久99热精品这里久久精品|国产日韩一区二区三区免费视频,大主宰txt全集下载,小说排行榜,古风小说

Location: Home > News > Company News
Construction & Installation
Publish:2023-10-09 11:22:05

Outdoor floor clamp fixation


1) Fixed keel: The keel is fixed to the ground with wire nails;
2) Fixed floor 1: Place the first floor on the keel;
3) Insert the buckle: Push the buckle into the four slots on both sides of the floor;
4) Fixed floor 2: Weigh the other side of the cartoon buckle on the second floor;
5) Fixing clamp: fix the clamp on the keel with screw.

Precautions: Make sure the ground is flat, clean, dry, and capable of driving nails

Reserved seam clamp: Reserve 5-6mm for the floor installation seam.


Reserved seam clamp: 5-6mm for floor installation seam
1. Minimum configuration of keel
laying cement bricks below the keel.
2. Professional configuration of keel
Double layer keel laid on cement bricks,
Ensure long-term stability.

3. Recommended specification of keel (unit: mm):
Anticorrosive wooden keel: 40 * 60, 50 * 80  60 * 100
Galvanized steel keel: 40 * 40 * 3.50 * 3.50 * 100 * 3.

4. Specification for keel spacing
The spacing between regular paving keels shall not exceed 465mm, special load-bearing requirements, with additional keel according to the situation
5. Normal phenomenon
Conventional outdoor surfaces can weather under the influence of wind, rain, frost, and sunlight (ultraviolet). After a period of use, discoloration, slight cracks, and rough surface are all normal phenomena.

Installation method of floor nailing



主站蜘蛛池模板: 南康市| 治县。| 岑溪市| 临澧县| 贡嘎县| 元江| 柳江县| 邳州市| 武夷山市| 无锡市| 缙云县| 崇左市| 泰安市| 肥城市| 安西县| 得荣县| 梁山县| 建水县| 和静县| 天祝| 彭州市| 沿河| 镇宁| 崇明县| 胶州市| 高清| 萝北县| 会昌县| 宜春市| 陵川县| 大安市| 土默特左旗| 清苑县| 阿合奇县| 绍兴市| 姚安县| 金昌市| 富川| 宁晋县| 四平市| 承德市|